通道及施工電梯防護棚要求要求

來源:http://www.48ad.com/   發(fā)布時間:2021-11-18

1塔吊半徑以內(nèi)所有后臺制作加工、攪拌區(qū)必須搭設(shè)雙層防護棚。

1. All backstage fabrication, processing and mixing areas within the radius of tower crane must be provided with double-layer safety protection sheds.
2.操作場所掛設(shè)的標(biāo)志牌有:機械驗收合格牌、警示牌、操作規(guī)程。標(biāo)牌 的掛設(shè)高度為離地面 2.6 m標(biāo)志牌規(guī)格為寬600mm*高800mm.
2. The signboards hung at the operation site include: Qualified Mechanical acceptance board, safety warning board and operation procedures. The hanging height of the sign is 2.6 m above the ground, and the specification of the sign is 600mm wide * 800mm high
3.地面必須進行砼硬化厚200mm,設(shè)置4L滅火器 2 只。開關(guān)箱與機械的水平 間距不得大于 3 m。
3. The ground must be hardened with concrete thickness of 200mm, and 2 4L fire extinguishers shall be set. The horizontal distance between the switch box and the machinery shall not be greater than 3 m.
4.雙層防護棚,兩層之間高度800mm,面層用噴繪布噴繪制成,正面為防護 棚名稱和標(biāo)志牌,其余三面采 用警示標(biāo)語。
4. The double-layer protective shed has a height of 800mm between the two layers. The surface layer is made of spray-painted cloth. The front side is the name of the protective shed and safety signs, and the other three sides are provided with safety warning slogans.
木工加工棚
5.加工棚名稱及標(biāo)語字高為400mm,長度根據(jù)尺寸現(xiàn)場均勻布置。
5. The name of the processing shed and the safety slogan are 400mm high, and the length is evenly arranged on site according to the size.
6.標(biāo)志牌:寬 400mm*高500mm
6. Safety signboard: 400mm wide * 500mm high
7.基礎(chǔ)施工前應(yīng)先視現(xiàn)場地質(zhì)情況做地基處理,處理方法可采用夯實、換填石 料等,必須保證其密實度
7. Before foundation construction, foundation treatment shall be carried out according to the site geological conditions. The treatment methods can be tamping, replacement of stones, etc., and its compactness must be ensured
8.立桿采用22#工字鋼立柱刷紅色油漆,每榀寬度5m,高3m。如施工現(xiàn)場場地不足,可以按5m每榀自行調(diào)整做法,但須經(jīng)現(xiàn)場技術(shù)人員同意。
8. The vertical pole adopts 22# I-steel, and the column is painted with red paint. Each frame is 5m wide and 3M high. If the construction site is insufficient, the method can be adjusted according to 5M each frame, but it must be approved by the on-site technicians.
9.圖中標(biāo)注為焊接的地方如無特殊說明的,均作滿焊處理 ,現(xiàn)場安裝前應(yīng)對各 構(gòu)件焊接質(zhì)量進行驗收
9. The places marked as welding in the drawing shall be fully welded unless otherwise specified. The welding quality of each component shall be accepted before on-site installation
10.鋼筋加工機具應(yīng)獨立配置開關(guān)箱,開關(guān)箱中心離地面高度為1.5m. 11.軟弱基礎(chǔ)及受臺風(fēng)影響地區(qū)須增設(shè)拉錨。
10. Rebar processing machines and tools shall be equipped with switch box independently, and the height from the center of the switch box to the ground shall be 1.5m. 11. Pull anchors shall be added in weak foundation and typhoon affected areas.

久久久国产精品无码免费专区| 欧美XXXX做受老人| 粉嫩被黑人两根粗大猛烈进出视频| 国产精品扒开腿做爽爽爽| 精品无码一区二区三区| 又硬又粗又长又大时间持久| 污调教贱乳打屁股扒开作文| 免费无码黄十八禁网站在线观看| 男人用嘴添女人下身免费视频| 最近中文字幕在线资源| 无码一区二区三区AV免费蜜桃视| 日本亲与子乱人妻HD| 二人扑克剧烈运动视频| 男朋友舌头伸到下面很肿胀| 腿再张大一点就可以吃到扇贝了| 含着奶头搓揉深深挺进P漫画| 18禁喷水流白浆自慰视噜噜噜| 重囗味SM在线观看无码| 风间ゆみの熟女俱乐部| 中文无码亚洲一区二区蜜桃| gogo人体gogo西西大尺度高清| 亚洲夂夂婷婷色拍WW47| 久久综合九色综合欧美狠狠| 一女被二男吃奶A片免费观看| 久久久久久久久久久精品| 色婷婷AV一区二区三区麻豆| 日韩免费无码一区二区视频| 51国产黑色丝袜高跟鞋| 人人妻人人澡人人爽人人精品电影| 久久久国产精品无码一区二区三区| 少妇高潮惨叫久久久久电影69| 国产精品99久久久久久宅男| 国语做受对白XXXXX在线| 免费人成在线观看网站| 曰本女人与公拘交酡| 国产成人无码WWW免费视频在线| 真人做爰高潮全过程免费视看| 一本色道久久综合亚洲精品| 浴室人妻的情欲HD三级| 日韩精品久久日日躁夜夜躁影视| 亚洲综合欧美色五月俺也去|