国产我和岳拇看A片,丰满少妇被猛烈进入无码,欧美精品一区二区少妇免费A片,国产人妻人伦精品无码.麻豆

濟(jì)南蓬發(fā)建材有限公司為您提供臨邊護(hù)欄、木工防護(hù)欄、工程圍擋等相關(guān)信息發(fā)布和相關(guān)資訊,敬請(qǐng)關(guān)注!
新聞
聯(lián)系我們
咨詢電話
15866735826

聯(lián)系:張經(jīng)理

手機(jī): 15866735826

郵箱: 394441862@qq.com

網(wǎng)址:http://www.48ad.com/

地址:山東省濟(jì)南市章丘圣井工業(yè)園

當(dāng)前位置: 首頁(yè) > 新聞中心 > 公司新聞

木工加工棚的施工設(shè)置內(nèi)容點(diǎn)

來(lái)源:http://www.48ad.com/   發(fā)布時(shí)間:2022-10-20

木工加工棚是為了保護(hù)施工現(xiàn)場(chǎng)的施工人員,用鋼管作為支撐框架,用竹簽或竹笆板或廢棄模板覆蓋作為防砸,或保護(hù)高壓線等穿過(guò)木工加工棚的東西。下面來(lái)講講木工加工棚的施工設(shè)置內(nèi)容點(diǎn)。
The woodworking shed is designed to protect the construction personnel at the construction site. Steel pipes are used as the support frame, bamboo sticks, bamboo fence boards or waste templates are used to cover the woodworking shed to prevent smashing, or high-voltage lines and other things passing through the woodworking shed are protected. Next, we will talk about the safe construction setting of the woodworking shed.
一般雙層保護(hù)是為了增加系數(shù),鋼筋加工棚和通道均為木工加工棚,部分木工加工棚建在塔吊覆蓋的辦公和生活區(qū)。木工加工棚是建筑施工過(guò)程中操作人員或人行的必經(jīng)通道,過(guò)往人員的木工加工棚為雙層。
Generally, the double-layer protection is to increase the safety factor. The steel bar processing shed and the safe passage are both woodworking sheds. Some woodworking sheds are built in the office and living areas covered by tower cranes. The woodworking shed is a necessary passage for operators or pedestrians during the construction process, and the woodworking shed for passers-by is double-layer.
從懸挑腳手架的懸挑處開(kāi)始,每隔十米設(shè)置一個(gè)木工加工棚,可以更好地保證木工加工棚下行走人員的。在施工過(guò)程中,在搭建木工加工棚時(shí)注意防護(hù)措施,施工人員按照施工要求進(jìn)行施工,露天攪拌機(jī)位置、現(xiàn)場(chǎng)混凝土攪拌機(jī)、卷?yè)P(yáng)機(jī)棚、鋼筋棚、木棚、部分出入口和現(xiàn)場(chǎng)廁所需要設(shè)置木工木工加工棚。
Starting from the cantilever of the cantilever scaffold, a woodworking shed shall be set every ten meters to better ensure the safety of people walking under the woodworking shed. During the construction, pay attention to the protective measures when setting up the woodworking processing shed. The construction personnel shall carry out the construction according to the construction requirements. The woodworking processing shed shall be set up at the location of the outdoor mixer, the site concrete mixer, the winch shed, the reinforcement shed, the wood shed, some entrances and exits and the site toilet.
木工加工棚
水平保護(hù)安裝和拆除前,進(jìn)行技術(shù)交底。高空作業(yè)人員經(jīng)過(guò)專門的技術(shù)培訓(xùn)和專門的考試,并持證上崗。木工加工棚使用的鋼管、扣件等材料符合JGJ130-2011《建筑施工扣件式鋼管腳手架技術(shù)規(guī)范》及相關(guān)標(biāo)準(zhǔn)的要求。
Safety technical disclosure shall be conducted before installation and removal of horizontal protection. High altitude operation personnel shall receive special technical training and examination, and take up their posts with certificates. The steel pipes, fasteners and other materials used in the woodworking shed shall meet the requirements of JGJ130-2011 Technical Code for Safety of Coupled Steel Pipe Scaffolds in Building Construction and relevant standards.
安裝和拆除水平木工加工棚時(shí),操作人員的“三寶”齊全并正確使用。木工加工棚搭設(shè)和拆除時(shí),應(yīng)避免上下同時(shí)作業(yè),錯(cuò)開(kāi)作業(yè)時(shí)間。安裝和拆除木工加工棚時(shí),所有材料和工具應(yīng)堆放在建筑物外緣少2m處,堆放高度不得超過(guò)1m。
When installing and removing the horizontal woodworking shed, the operator's "three safety precautions" shall be complete and used correctly. When erecting and dismantling the woodworking shed, it shall be avoided to work up and down at the same time and stagger the operation time. When installing and removing the woodworking shed, all materials and tools shall be stacked at least 2m away from the outer edge of the building, and the stacking height shall not exceed 1m.
拆除的材料及時(shí)傳遞到地面并運(yùn)走,嚴(yán)禁高空拋擲。建造和拆除木工加工棚時(shí),應(yīng)在地面上設(shè)置警戒區(qū),并派專人監(jiān)控。建造和拆除木工加工棚時(shí),應(yīng)指定專人指揮。
The dismantled materials shall be delivered to the ground and transported away in time, and it is strictly prohibited to throw them at high altitude. When building and removing the woodworking shed, a warning area should be set on the ground and a special person should be assigned to monitor it. When building and dismantling the woodworking shed, a specially assigned person shall be assigned to command.
管理人員應(yīng)注意眼、腿、口,采取有效的防護(hù)措施應(yīng)對(duì)危險(xiǎn)情況,確保人員。在雨天和大風(fēng)天氣,應(yīng)暫停木工加工棚的搭設(shè)和拆除,并檢查和維護(hù)木工加工棚的質(zhì)量。
The management personnel shall pay attention to the eyes, legs and mouths, and take effective safety protection measures to deal with the dangerous situations and ensure the safety of personnel. In rainy and windy days, the erection and removal of woodworking shed shall be suspended, and the quality of woodworking shed shall be inspected and maintained.
木工加工棚搭設(shè)完成后,經(jīng)專職員驗(yàn)收合格后方可投入使用。在搭設(shè)和拆除水平防護(hù)前,進(jìn)行技術(shù)交底。關(guān)注我們http://www.48ad.com,為你講解更多的相關(guān)內(nèi)容事項(xiàng)!
After the woodworking shed is erected, it can be put into use only after being accepted by the full-time safety officer. Safety technical disclosure shall be conducted before erection and removal of horizontal protection. Follow us http://www.48ad.com , explain more relevant contents for you!

亚洲国产精彩中文乱码AV| 娇小小小泬XXXX护士| 强行剥开两边虐花蒂玩弄| 与亲生子伦中文字幕| 被几个人摁住玩弄隐私作文| 亚洲成av人片一区二区密柚| 成人自偷拍一区二区| 女人18毛片A级毛片免费视频| 拍国产真实伦偷精品| 无码无遮挡刺激喷水视频| 成人性做爰AAA片免费看曹查理| 人体张悠雨全身光一丝不| 精品久久久久中文字幕| 中文人妻熟妇乱又伦精品| 无码少妇一区二区三区芒果| 国产亚洲精品久久久久久无码下载| 免费做爰猛烈吃奶摸视频在线观看| 无码亚洲成A∧人片在线播放| 国产免费AV片无码永久免费| 中国猛少妇色XXXXX| 鸡毛飞上天电视剧全集观看免费| 精品无码国产一区二区| 国偷自产AV一区二区三区123| XXXX丰满小少妇女高潮| 97人妻无码AV碰碰视频| 亚洲精品一区二区三区麻豆| 成码无人AV片在线电影网站| 国产精品JIZZ在线观看老狼| 国产成人AV乱码在线观看| 日本无遮挡真人祼交视频| 亚洲国产精品无码久久一区二区| 成 人 免费 黄 色 网站视频| 图片区小说区激情区偷拍区| 漂亮人妻被黑人久久精品| 成人国产片女人爽到高潮网站| 国产真人无码作爱视频免费| 免费观看性生交大片| 在线天堂中文最新版网| 伊人久久大香线蕉AV影院| 被绑在机器上榨精失禁男男| 各处沟厕大尺度偷拍女厕嘘嘘|