国产我和岳拇看A片,丰满少妇被猛烈进入无码,欧美精品一区二区少妇免费A片,国产人妻人伦精品无码.麻豆

濟(jì)南蓬發(fā)建材有限公司為您提供臨邊護(hù)欄、木工防護(hù)欄、工程圍擋等相關(guān)信息發(fā)布和相關(guān)資訊,敬請(qǐng)關(guān)注!
新聞
聯(lián)系我們
咨詢電話
15866735826

聯(lián)系:張經(jīng)理

手機(jī): 15866735826

郵箱: 394441862@qq.com

網(wǎng)址:http://www.48ad.com/

地址:山東省濟(jì)南市章丘圣井工業(yè)園

鋼筋加工棚的8點(diǎn)安裝事項(xiàng)

來源:http://www.48ad.com/   發(fā)布時(shí)間:2023-02-17

鋼筋加工棚是施工現(xiàn)場(chǎng)鋼筋調(diào)直、彎曲和焊接的場(chǎng)所。鋼筋加工棚我們來看看是怎么裝的。
The reinforcement processing shed is the place for reinforcement straightening, bending and welding at the construction site. Let's see how to install the reinforcement processing shed.
1、埋設(shè)預(yù)埋件(預(yù)埋件包含在單柱鋼棚內(nèi),雙柱安裝使用膨脹螺絲)
1. Embedded parts (embedded parts are included in single-column steel shed, and expansion screws are used for double-column installation)
2、將主梁與立柱連接器對(duì)接,(不要擰14個(gè)螺絲),鋼筋加工棚先將斜撐安裝在上斜撐上(用14個(gè)螺絲)。否則,支架的孔沒有對(duì)齊。
2. Connect the main beam with the column connector (do not tighten 14 screws), and install the diagonal brace on the upper diagonal brace (use 14 screws) in the reinforcement processing shed. Otherwise, the holes of the bracket are not aligned.
3、安裝主梁(單柱主梁為140工字鋼和50方管焊接框架,雙柱主梁為50方管焊接框架)與柱之間的連接件(14個(gè)螺釘)。
3. Install the connections (14 screws) between the main beam (140 I-beam and 50 square tube welded frame for single-column main beam, and 50 square tube welded frame for double-column main beam) and the column.
4、用叉車或吊車將立柱吊起安裝,間距3米(單柱單柱為200工字鋼,雙柱為100方管)。鋼筋加工棚安裝時(shí),確保立柱的腰線在中間3米。方管柱底盤通過20*180膨脹螺栓與預(yù)埋件連接,H型鋼柱。
4. Use a forklift or crane to lift and install the columns with a spacing of 3 meters (single column and single column are 200 I-beams, and double columns are 100 square tubes). When installing the reinforcement processing shed, ensure that the waist line of the column is 3 meters in the middle. The square pipe column chassis is connected with the embedded parts through 20 * 180 expansion bolts, and H-shaped steel column.
鋼筋加工棚
5、安裝側(cè)梁(50方管焊接框架),兩邊用10×12螺釘,中間用10×18螺釘。
5. Install the side member (50 square tube welded frame) with 10 on both sides × 12 screw, 10 in the middle × 18 Screw.
6、安裝檁條,底層6個(gè)2.99米鉆尾,鋼筋加工棚4個(gè)2.94米夾角鐵,裝上。
6. Install purlins, six 2.99m drilled tails at the bottom, and four 2.94m angle iron clips at the top of the reinforcement processing shed, and install them.
7、設(shè)置彩鋼屋面,彩鋼板尺寸為1.14*3.0米,中間每隔3米,在柱的左右兩側(cè)放置三塊彩鋼板,鋼筋加工棚彩鋼板通過鉆尾絲與下檁條連接。
7. The color steel roof is set. The size of the color steel plate is 1.14 * 3.0m, and three color steel plates are placed on the left and right sides of the column every 3m in the middle. The color steel plate of the reinforcement processing shed is connected with the lower purlin through the drilling tail wire.
8、四面安裝廣告布,用鉆尾絲打邊梁和主梁。
8. Install advertising cloth on all sides, and punch the side beam and main beam with drilling thread.
鋼筋加工棚的施工規(guī)范是日常建筑施工中必不可少的。這種規(guī)范可以給我們帶來放心,保證建筑的牢固性。更多相關(guān)內(nèi)容就來我們網(wǎng)站http://www.48ad.com咨詢!
The construction specification of reinforcement processing shed is indispensable in daily construction. This kind of specification can give us reassurance and ensure the firmness of the building. Come to our website for more relevant content http://www.48ad.com consulting service

色欲人妻AAAAAAAA无码| 寂寞少妇扒开双腿猛烈进入免费看| 巨肉黄暴辣文高H文| 丰满白嫩大屁股ass| 国产老头老太作爱视频| 人妻少妇精品视频三区二区一区| 国产黄大片在线观看| 午夜亚洲AV永久无码精品| 99精品人妻无码专区在线视频| 波多野结衣AV无码| 久久久精品人妻一区二区三区| 亚洲美女高潮久久久久| 亚洲欧洲VAT| 国产AV旡码专区亚洲AV苍井空| 国产精品亚洲日韩欧美色窝窝色欲| 性做久久久久久久久| 日本爽爽爽爽爽爽在线观看免| 亚洲综合无码精品一区二区三区| 白袜校草被小混混脱裤玩J| 麻豆亚洲AV永久无码精品久久| 少妇AAA级久久久无码精品片| 精品熟女60老妇AV免| 亚洲国产精品无码久久九九大片| 被部长连续侵犯中文字幕| 99久久国产精品免费热7788| 国产又黄又爽又湿的免费网站| 一本一道波多野结衣AV中文| 国产精品日本一区二区在线播放| 娇妻系列交换27部多P小| XXXX丰满小少妇高潮| 久久免费看少妇高潮A片特无毒| 人妻丰满熟妇AV无码区HD| 97精品人妻一区二区三区香蕉| 丰满少妇被猛烈进入在线播放| 日韩V亚洲V欧美V精品综合| 两根粗大在她腿间进进出出H| 波多野结衣人妻厨房大战| 久久久久久久精品成人热小说| 久久精品99国产精品日本| 免费A级毛片在线播放不收费| 中国杭州少妇XXXX做受|